News  

News

05/24/17

Route 8 & Waterbury Branch Line Corridor Transit-Oriented Development & Alternate Modes Assessment Project

Visit this page to learn about the Naugatuck Valley Council of Government’s (NVCOG) study to assess alternative transportation modes within the Route 8 and Waterbury branch rail line corridors.

More Info
05/22/17

Black Rock Turnpike Safety Study Page is Now Available

This study will identify strategies to create a safe and attractive pedestrian environment, a robust infrastructure for bicyclists, and linkages between residential areas and the shops, businesses and restaurants along Black Rock Turnpike.

More Info
04/17/17

Route 25 and 111 DRAFT Existing Conditions Technical Memorandum is now available

Route 25 and 111 DRAFT Existing Conditions Technical Memorandum is now available.

More Info
01/23/17

Annual Listing of Obligated Projects, 2016

The annual listing of obligated projects for 2016 is now available.

More Info
10/06/16

CTDOT Air Conformity Results are Now Available

The Greater Bridgeport and Valley Metropolitan Planning Organization (GBVMPO) is opening the public involvement process for a 30 day period.

More Info

<< < Page 2 of 10 > >>